Crew coordination & site readiness for general contractors
CrewCanvas connects your schedule, subcontractors, crew availability and site checklists — then flags the missing inspection, the double-booked crew and the overlapping work window days before they cost you a mobilization.
AI explains risk and suggests next steps. Readiness is still decided by verified checklist results and an authorized person's sign-off.
Level 1 electrical rough-in
Approved · D. Ruiz
Fire sprinkler mains — L1
Zone overlap
Level 2 slab-on-deck pour
Inspection report missing
Temporary power — L2–3
Crew double-booked
Curtain wall — north & east
Steel trending late
Suggested action
Hold the L2 pour. Swap in the loading dock slab Oct 22 so Summit Crew 1 stays productive.
Product
Work packages, dependencies, crews, checklists and evidence live together, so every warning traces back to a record someone can act on.
Reads the recorded checklist for every upcoming activity and flags what is unverified before the crew is dispatched — with who owns it and when it is due.
Finds overlapping tasks, double-booked or unavailable crews, out-of-sequence dependencies, shared equipment and conflicting work windows across your whole portfolio.
Ranks the next three weeks of work by unresolved dependencies. Every point in the score has a plain-language reason, so a warning is never a black box.
Turns photos, checklist results and field notes into a short activity summary per work package, compared against planned progress.
Suggests the practical next move: hold, verify, resequence, reassign a crew or escalate — and changes the suggestion as soon as the facts change.
Blockers, conflicts, approvals needed and today's actions — ready for the morning huddle.
How readiness is decided
CrewCanvas never declares a site safe or ready because a model said so. A package is only marked approved when every required checklist item has a recorded verification and an authorized superintendent or project manager signs off.
Checklist records
Verified · pending · failed — with who and when
Readiness rules
Deterministic: blocked · outstanding · awaiting approval
Human approval
Superintendent or PM records the decision
Contractor use cases
Superintendents
Project managers
Subcontractors
Operations leaders
Interactive demo
The Level 2 deck pour on our fictional medical office project is three days out. Everything is verified except the third-party inspection of the steel connections below it.
03-200 · Thu, Oct 22–Oct 23 · Summit Concrete Placement Crew 1
Toggle a result to see how CrewCanvas reacts. Only recorded results count.
Special inspection of L2 steel connections (bolting & welds) — report received
prerequisite · Keystone Testing & Inspection
Metal deck attachment & side-lap fasteners inspected
quality · Northline project engineer
Embeds, sleeves & deck penetrations signed off by MEP trades
prerequisite · Delta / Brightline / Apex
Welded wire reinforcement placement inspected
quality · Keystone Testing & Inspection
Mix design, pump & truck schedule confirmed with supplier
logistics · Summit Concrete Co.
Leading-edge & perimeter fall protection in place on L2
safety · Northline safety
⚠ Missing prerequisite · critical
Level 2 slab-on-deck pour is scheduled Oct 22 – Oct 23 but these required checklist items are not verified: “Special inspection of L2 steel connections (bolting & welds) — report received” (pending, Keystone Testing & Inspection).
Summit Crew 1 sequence · swap suggested
1 required checklist item(s) are not verified: Special inspection of L2 steel connections (bolting & welds) …
PostgreSQL
Projects, schedules, dependencies, crews, checklists and an append-only verification audit trail.
Amazon S3
Site photos and inspection reports, uploaded directly from the field with encrypted, short-lived links.
Amazon Bedrock
Grounded summaries and recommendation explanations, with deterministic fallbacks.
AWS Lambda
Background checks each morning and on change — blocker and conflict notifications to the right people.
Pricing
Invite every foreman and subcontractor at no extra cost. Closed-out projects stay read-only for free.
For a single job that needs tighter trade coordination.
$390
per active project / month
For general contractors running a multi-project portfolio.
$2,400
per month · up to 10 active projects
For enterprise builders with regional operations and IT requirements.
Custom
annual agreement
Request a demo
In 30 minutes we load one of your active projects and walk through readiness, conflicts and the daily report with your team.